“Ang pagpapaunlad ng imprastraktura ng administrasyon ay nananatiling tuloy-tuloy, strategic at nasa iskedyul.”
What Vera Files found
Ang mga petsa ng pagtatapos ng hindi bababa sa anim sa 185 Infrastructure Flagship Projects, kabilang ang Samal Island-Davao City Connector Bridge, Metro Manila Subway Project at Metro Rail Transit Line-7, ay binago dahil sa mga pagkaantala na kadalasang may kinalaman sa mga isyu ng right-of-way.
Their words, from the summary they publish with the rating.
In short
Ferdinand Marcos Jr. made this claim around 22 July 2024. Vera Files (Philippines) looked into it and published its finding on 6 August 2024, 15 days later. Its rating was “Kailangan ng konteksto”.
Ferdinand Marcos Jr. has 62 checked claims in this archive. Fact-checking organisations rated 17 of them false or fake, 43 misleading or mixed and 0 true.
Where the claim appeared
- YouTube videohttps://youtu.be/Oe-08304sVQ?t=929
Links recorded by Vera Files. Some posts may have been deleted since.
This check was done by Vera Files, not by DoesItStand. We list it so you can find it. Their full evidence and reasoning are in their article.